Step 1
Consultation and Site Assessment
Every piling job starts with a conversation. Once you
get in touch,
we’ll discuss your drawings, budget and access, and arrange a site visit.
Based on what we find, we’ll propose the best piling method – mini piles,
CFA piles or deeper bored piles.
Step 2
Piling Installation
When the plan is agreed, we schedule the works. Our teams work quickly and safely,
and we aim to minimise disruption – especially on lived-in residential properties.
We usually only need a few days’ notice to mobilise in areas such as Sydenham,
Chiswick, Putney and Twickenham.
Step 3
Inspection and Completion
Before handover, we liaise with local building control so the foundation is signed off correctly.
Once it’s approved, we complete the concrete works and leave the site ready for the next trade.
For general guidance, see this building control resource:
Building control.
Recent Foundations We've Installed
Real figures from recent jobs, so you can judge the scale and type of work we take on:
- Helenslea Avenue, Golders Green NW11 – 219 piles for a new two-storey building with a basement: 163 contiguous piles (350 mm, 8 m deep) forming the retaining wall, plus 56 bearing piles in London Clay. Installed in under three weeks; daily output rose from 12–14 to 18–20 piles, saving the main contractor up to a week.
- Rectory Lane, Shenley WD7 – 65 bored piles (350 mm, 9.5–12 m deep), reinforced concrete ground beams and a 200 mm slab on Lambeth Group and Chalk.
- Ringwood Avenue, Finchley N2 – 23 bored piles (300 mm, up to 9 m) and 115 m of 500×500 mm ground beams on a restricted-access residential site.
- Whitehouse Avenue, Borehamwood WD6 – 19 bored piles (350 mm), ground beams and anti-heave protection for two semi-detached houses, with the substructure completed in two weeks.
How Much Does a Piled Foundation Cost?
For a typical London house extension, mini piles usually cost £250–£450 per pile, and a complete job most often falls between £6,000 and £10,000. The final figure depends on:
- Number and depth of piles – set by your engineer from the loads and ground-beam layout. Shrinkable London Clay near trees often means deeper piles.
- Access – a site reached only through the house or a narrow side passage needs a smaller rig and more handling time.
- Spoil – how much soil comes out and how it leaves the site.
- Testing – load, integrity or concrete cube tests where your engineer or Building Control asks for them.
- Ground beams and caps – whether we also install the reinforced concrete above the piles.
Send us your engineer's drawings or site investigation report and we'll return a written quotation.
Building Control, Party Wall and Your Neighbours
Building Control. Piles don't usually need their own planning permission, but the foundation design must be approved by Building Control – your council or an approved inspector. We provide the pile installation records they ask for.
Party Wall etc. Act 1996. If you excavate within 3 metres of a neighbour's building and deeper than its foundations (or within 6 metres in some cases), you must serve notice at least one month before work starts. Piling often falls into this category, so build the notice period into your programme.
Noise and working hours. Most London boroughs allow noisy building work roughly 8am–6pm on weekdays and 8am–1pm on Saturdays, with none on Sundays or bank holidays – check your council's rules. Our mini piling and CFA rigs drill rather than hammer, which keeps vibration low next to older walls.
Trees and clay. On shrinkable clay near trees, your engineer may specify deeper piles and heave protection under the ground beams. We install both.
+
The Importance of Choosing the Right Piling Contractor
Your entire build sits on this phase, so it pays to get it right.
At KHB Piling LTD we aim to leave you with a clean, engineered foundation
that won’t cause problems later.